
The New Grange Care Home, Worthing
Homefield Road, Worthing BN11
Completed May 2026
Commercial plant call-out attended at a live care home facility.
Read more24/7 emergency response available
Ape BMS Controls — specialist BMS installers across the capital. Design, installation, commissioning and 24/7 emergency response on Trend, Tridium Niagara, Siemens, Schneider and Honeywell across every major commercial platform deployed in London.

Live install · EC2
Form 4 panel — Trend IQ4 head-end
<4 hrs
Priority response
M25 +
Coverage
24/7
On call
01 — Services
End-to-end BMS installation for new commercial developments across London — controls strategy, Form 4 panel build, field-device install, head-end software and BREEAM-aligned commissioning.
Like-for-like swaps and platform migrations on live London buildings — Trend IQ3 to IQ4, Satchwell to Trend, legacy Siemens to Desigo and Honeywell to Tridium Niagara with zero-downtime cutover.
Tridium Niagara N4, Trend 963/IQVision and Desigo CC supervisor installs across multi-site London estates — single pane of glass, secure remote access and BACnet/IP backbones.
AHU, chiller, boiler, FCU and ventilation controls installed across City of London, West End and Canary Wharf — full sequence of operations and CIBSE Guide H commissioning.
Sub-metering, M&T dashboards, occupancy strategies and AI optimisation layers deployed on top of your London BMS — typical 15–30% energy reduction in the first year.
Independent commissioning, witness testing, soft-landings handover and planned preventative maintenance contracts for newly installed BMS across Greater London.
02 — Platforms
IQ3, IQ4, IQVision and 963 head-ends
TRIDIUMNiagara 4, JACE and Supervisor specialists
SIEMENSDesigo CC, PXC and Talon controllers
SCHNEIDEREcoStruxure Building Operation, SmartX & Continuum
HONEYWELLWEBs, Niagara, ComfortPoint Open & Excel
Service directory

Homefield Road, Worthing BN11
Completed May 2026
Commercial plant call-out attended at a live care home facility.
Read more03 — How we work
A predictable BMS installation process built for London commercial estates — pre-built off-site, staged out-of-hours, signed off with full O&M and M&V documentation.
01
Walk the plantroom, audit existing controls, agree a vendor-neutral strategy and scope.
02
Form 4 panel design, schematics, points list and FAT-tested build in our UK workshop.
03
Out-of-hours installation, floor-by-floor cutover and zero-downtime live migration.
04
Full commissioning, BMS strategy upload, O&M pack and 12-month workmanship cover.

04 — Sectors
Cat A/B fit-outs, multi-tenant HVAC zoning, BREEAM Excellent commissioning.
Guest-room BMS, kitchen extract, pool plant and 24/7 critical alarm cover.
CRAC/CRAH control, N+1 resilience strategies and BACnet integration to DCIM.
HTM-compliant controls, theatre ventilation and isolation-room pressure.
School, college and university BMS installs, ULEZ-aligned plant scheduling.
Mall HVAC, demand-controlled ventilation and tenant sub-metering.
05 — About
Ape BMS Controls is a specialist team of BMS installers based in and serving Greater London. Every project we deliver — from a single Form 4 panel swap in a Mayfair office to a full Tridium Niagara head-end migration across a Canary Wharf estate — is engineered, installed and commissioned in-house by certified BMS engineers.
We are completely vendor-independent. That means our London BMS installers will specify Trend, Tridium, Siemens Desigo, Schneider EcoStruxure or Honeywell strictly on the basis of what fits your building, your existing controls infrastructure and your long-term operating model — never on commission.
Every BMS installation we deliver in London is pre-fabricated and FAT-tested off-site in our UK panel-build workshop, then staged out-of-hours on site to keep live tenants and critical plant running. Cutovers are floor-by-floor, with rollback plans for every step.
Our BMS installers cover the full City of London, West End, Canary Wharf, Stratford, Wembley and the entire M25 corridor — with a 4-hour priority response SLA on critical sites and 24/7 emergency call-out on every contract.
Beyond installation, we provide PPM contracts, BEMS energy optimisation, sub-metering, M&T reporting and BMS lifecycle planning so that the system we install on day one keeps delivering measurable efficiency for the next 10–15 years.
Whether you're a managing agent, M&E consultant, main contractor or in-house FM team, talk to us before your next London BMS installation project. We'll walk the plantroom, scope a vendor-neutral strategy and put it in writing — usually within 48 hours of a site survey.
5+ platforms
Vendor-neutral
FAT-tested
Panel workshop
Zero downtime
Out-of-hours
12-mo cover
Workmanship
06 — From the field
Control panels, head-end graphics, Trend IQ strategies and HMIs from live London commercial estates installed and maintained by our team.

Block C plantroom MCP01

Twin Form 4 control panels

Boilerhouse panel & burners

Ideal Evomax cascade

Plantroom MCP control panel

Panel build & I/O

Mimic & status indication

Boilerhouse head-end graphic

FCU strategy graphic

Trend IQ strategy

Critical alarm logic

RDM Intuitive HMI
07 — Trusted by
“Used Ape as our BMS installers across three City of London commercial buildings — Trend IQ4 and a Niagara head-end. Clean handover, sensible reporting and engineers who actually understand BMS strategy.”
“BEMS install and optimisation project on a 1990s West End office tower. They re-tuned setpoints, fixed simultaneous heating/cooling and gave us a clear M&V baseline. Energy bill down ~22% in the first quarter.”
“Niagara N4 supervisor upgrade and BACnet/IP migration delivered out of hours across a Canary Wharf estate with zero downtime. Documentation was excellent.”
“Designed and installed a Form 4 BMS control panel for a new AHU plantroom in Southwark, FAT-tested before delivery. Smooth commissioning and a proper O&M pack.”
08 — Coverage
BMS installers mobilised across every London borough — plus the Home Counties for project work and PPM contracts.
All coverage areas4-hour critical response, PPM contracts from £1,800 a year, covering London, the Home Counties & nationwide — Trend & Niagara approved BMS engineers.
| Service | From (ex VAT) |
|---|---|
| Essential BMS Maintenance Contract 2 planned visits per year, remote head-end checks, next-business-day reactive response. | £1,800 per year |
| Performance BMS Maintenance Contract 4 planned visits per year, same-day critical / next-business-day standard SLA. | £4,500 per year |
| Critical BMS Maintenance Contract Monthly planned visits, 24/7 cover and a 4-hour critical SLA. | £9,500 per year |
| Service | From (ex VAT) |
|---|---|
| BMS Site Survey & Strategy Report | £950 per survey |
| BMS Control Panel Design (Form 2/3/4) | £2,200 per panel |
| Niagara N4 Supervisor Build | £4,800 per build |
| Trend IQ4 Controller Replacement | £1,650 per unit |
| BACnet / Modbus Integration | £180 per device |
Indicative prices — final quote confirmed after a free site survey. Full pricing
09 — FAQ
A BMS installer designs, fits and commissions the controllers, sensors, valves and head-end software that run HVAC, lighting and plant in a commercial building. Our London team handles full installs, retrofits and panel replacements across every major BMS platform.
Read moreYes — we cover the City, West End, Canary Wharf, Greater London and the M25 corridor. Most London BMS installations are scoped within 48 hours of a site survey, with critical sites supported on a 4-hour response SLA.
Read moreWe are vendor-independent BMS installers — fully trained on Trend, Tridium Niagara, Siemens Desigo, Schneider EcoStruxure and Honeywell, plus open protocols including BACnet, Modbus and KNX.
Read moreBMS maintenance contracts start from £1,800 a year (Essential), £4,500 a year (Performance) and £9,500 a year (Critical, with a 4-hour critical SLA). All prices exclude VAT and are confirmed after a free site survey.
Read moreYes. Our London BMS installers work out-of-hours, stage cutovers floor-by-floor and pre-build Form 4 panels off-site so live tenants and plant aren't interrupted during installation.
Read moreSpeak to a BMS engineer about your estate. We provide free site surveys, no-obligation proposals and lifecycle support across every major controls platform.
Vendor-independent · Trend · Tridium · Siemens · Schneider · Honeywell
BMS Controls London from APE BMS Controls is priced from £120+VAT, with a fixed written quote issued after a free site survey. Call 07427 826446 to arrange it.
BMS Controls London from APE BMS Controls is priced from £120+VAT, with a fixed written quote issued after a free site survey. Call 07427 826446 to arrange it.
Yes. Our engineers cover London, London, the Home Counties and the M25, with 24/7 emergency cover and a 4-hour critical response for PPM contract clients.
We are vendor-independent and Trend & Niagara approved, also working with Siemens, Schneider and Honeywell controls over BACnet, Modbus and KNX.
Call 07427 826446 or book online for a free site survey. We confirm the scope and a fixed price in writing before any work starts.